

![]() |
Chronoslab®, the mini Précoffré slab ready in stock, is lighter, easier to handle and faster to assemble: a multipurpose product designed to be adapted without constraints to each type of flooring, crawl space, basement, floor or attic.
Kept in stock and deliverable within 3 days, Chronoslab® makes all the difference on the site! No need for storage areas, direct assembly with a truck equipped with a crane, no difficult manual assembly, no heavy loads to be lifted, no waste on the site. Safety, coordination and speed: Chronoslab’s® remarkable lightness and its narrow width make assembly easy and safe without cumbersome heavy lifting equipment. A truck equipped with a crane is all that is needed for loading, transport, unloading and assembly. Detached housing site coordination is made even easier by the delivery of all the elements in a single batch, saving yet more time.
The Fehr Technologies design office is ready to listen to you and assist you from sizing to the general layout plan. Site support: on demand, Fehr Technologies’ services include the design and formulation of the layout plan, the supply of Chronoslab®, delivery by self-loading truck, unloading at the site, and assistance with assembly.
• Fixed width limited to 1.22 m
• Length: from 2 m to 6 m
• Thickness: 5 cm, reinforced concrete C 40/50
• Ready to paint, easy to cut
• Assembly rate: 66 m²/hour


